Our Projects
Delivering precision and reliability in the most challenging terrain in the Niger Delta.
As-Built Survey of Nun River Wells
As-Built survey of Nun River Well 1, 4, 6, 7, 11, 12 and 16 locations and flowline corridor.
Notore LM2500 Power Plant Geotechnical Survey
Geotechnical soil investigation for the proposed Notore LM2500 power plant project.
Samabri/Biseni Field Development Survey
Geophysical and geotechnical survey for the Samabri/Biseni field development project.
Soku NAG Compression-2 Site Survey
As-Built survey of surface and underground facilities at proposed Soku NAG Compression-2 site.
Imo River Pipeline As-Built Survey
As-Built survey of 12'' Imo River 1 & 11 to Oghale pipeline.
Tunu Well-04 Bathymetric Survey
Bathymetric survey of Tunu Well-04 location for well operations support.
Escravos to Forcados River Manifold Survey
Boundary reopening, GPS monumentation and observation surveys of 24" F/L from Escravos Manifold to Forcados River Manifold.
International Breweries Ilesa Underground Survey
As-Built survey of underground facility of proposed area at International Breweries Ilesa.
Ground Water Assessment Topographical Survey
Topographical survey of site for ground water assessment and remediation.
Multi-Beam Bathymetric Survey of Calabar Channel
High-resolution multi-beam bathymetric survey of Calabar River channel for port operations.
Soku Condensate Tank Monitoring
Tank monitoring survey of Soku Condensate Tank (T-5501) for settlement analysis.
NPA Calabar River Channel Bathymetric Survey
Multi-beam bathymetric survey of Calabar River channel for navigation channel maintenance.
OML 83 & 85 Anyala Field Survey
Geophysical and geotechnical survey of OML 83 & 85 (GPF) Anyala Field, offshore Nigeria.
Anyala & Madu Field Pipeline Survey
Geophysical and geotechnical survey of OML 83 & 85 (MADP, ANDP-1 & pipeline route) at Anyala & Madu Field.
Madu to Anyala Pipeline Route Survey
Geotechnical investigation of pipeline route from Madu to Anyala at Madu and Anyala Fields.
Gbaran Ubie CPF Foundation Probing
Probing survey within SPDC Gbaran Ubie Central Processing Facility for air receiver installation.
Oloma Flow Station Underground Probing
Probing of underground facilities at Oloma Flow Stations.
Bonny Terminal Underground Probing
Probing of underground facilities at Bonny Terminal for facility upgrade planning.
Akaibiri Market Geotechnical Investigation
Geotechnical investigation of proposed Ultra Modern Market at Akaibiri.
Agbada 1 & 2 Encroachment Survey
As-Built survey of selected wells and flowlines in Agbada 1 & 2 for encroachment management.
Okoloma Gas Plant Condensate Pump Installation
Survey for installation of 18,000 barrel per day condensate evacuation pump at Okoloma Gas Plant.
Bonny Terminal Tank Settlement Survey
Tank settlement survey for BOGT (9 tanks) at Bonny Terminal.
Bonny Terminal Metering Skids Survey
Underground facility probing of Bonny Terminal metering skids locations.
Assa North Pipeline GPS Control Survey
GPS control survey of Assa North 18"/24" pipeline route to Obiafu-Obrikom tie-in point.
Forcados Yokri - Northbank CPF Survey
Boundary re-opening and detail survey of Forcados Yokri – Forcados Northbank CPF.
Bonny SXLZ-1 Well/Gyro Fix Survey
Well/Gyro fix for Bonny SXLZ-1 location.
TNPL Package 3 Full Preparation Survey
Full preparation survey of a section of TNPL (Package 3) from TNPL3451/TNPL3452 to Bonny Terminal.
Kambo Well 5L Flowline Survey
Boundary re-opening, route verification, and detail survey of Kambo Well 5L flowline.
Bonny TTMK-1 Rig Positioning
Rig positioning/well fix survey of Bonny TTMK-1 location.
Gbaran CPF Jetty Bathymetric Survey
Multi-beam bathymetric, side scan sonar, magnetometer, and grid levelling survey for Gbaran CPF Jetty.
Soku Gas Plant 3D Laser Scanning
As-Built surveys and 3D laser scanning of Soku Gas Plant for facility modeling.
Escravos Well-2 Access Survey
Boundary re-opening and detail survey of part of Escravos Well-2 access opposite Escravos Flowstation.
Trans Niger Pipeline Re-route Survey
PI/FP surveys for Trans Niger Pipeline Loop Line NPA re-route section.
Waterkiri-2X Well/Gyro Fix
Well/Gyro fix of Waterkiri-2X location.
Bonny SWLZ-1 Full Preparation Survey
Full preparation, grid leveling and well/gyro fix for Bonny SWLZ-1 location.
Bonny Terminal HI CPF Survey
As-Built/Grid levelling survey of proposed Bonny Terminal HI Central Processing Facility.
Belema CPF and FLB Site Survey
Full preparation, grid leveling, and sounding of proposed Belema CPF and FLB site.
JK-Belema CPF Pipeline Survey
Preliminary investigation/full preparation survey of 20" JK-Belema CPF pipeline (onshore section).
Assa North-Obirikom Gas Pipeline Survey
PI/FP surveys of 18'' and 24" proposed gas line from Assa North to Obirikom.
Swamp East Flood Gauge Monitoring
GPS monumentation and survey for control of flood gauges in Swamp East operations.
Gbaran-Ubie CPF Jetty Bathymetric Survey
Bathymetric and topographic survey of a section of Nun River adjoining Gbaran-Ubie CPF jetty area.
Nembe VDLR-1 Well Fix
Well fix of Nembe VDLR-1 location.
Cawthorne Channel Flowstation Survey
As-Built survey of underground cable/metal/pipe location at Cawthorne Channel Flowstation 3 slot and environs.
TNPL Shipwreck Area Survey
Detail/As-Built surveys of 24''/28'' TNPL shipwreck area at Urukalaka near Bonny River.
Soku Gas Plant Pipeline As-Built Survey
As-Built and FP survey of 18" & 12" pipelines from Soku Gas Plant to San Barth M/F.
Trans Niger Pipeline PI/FP Survey
PI/FP surveys for the proposed 30" Trans Niger Pipeline.
Nembe Electricity Route Bathymetric Survey
Bathymetric survey of proposed Nembe 2 to Ogolombiri/Bassambiri electricity route.
TK-1 and TK-2 Location Survey
FP survey of TK-1 and TK-2 locations, boundary reopening and access road survey from location to East-West Road.
Amadi Flats Cadastral Survey
Cadastral survey of Amadi Flats for property documentation.
RVSG Cassava Processing Plant Survey
Survey for Rivers State Government (RVSG) Cassava Processing Plant project at Afam Okoloma.
36" Oghale to Bonny Pipeline Survey
As-Built, PI and FP survey for the proposed 36" pipeline (Oghale to Bonny section).
Trans-Niger Spur Line Survey
AB/PI/FP survey for the proposed route for Trans-Niger spur line.
Awoba Process Barge Pre-Survey
Pre-survey of Awoba process barge repairs.
Soku Gas Plant JTF Camp Survey
As-Built survey of small target portion of Soku Gas Plant (JTF Camp).
Nembe Electricity Route Survey
Nembe electricity route project survey.
Zarama Well 1 & 2 Locations Survey
PI/FP/As-Built surveys of Zarama Well 1 & 2 locations and access road.
Korama NAG to Gbaran CPF Survey
FP of additional acquisition for proposed Korama NAG to Gbaran CPF and as-built survey of pipeline crossing.
Okoloma NAG Plant As-Built Survey
As-Built/FP survey of Okoloma NAG Plant.
Imo River Pipelines Survey
FP/As-Built survey of 8", 12" & 24" Imo River pipelines from Imo Gate (Manifold) to Kom-Kom (Manifold).
Southern Swamp Associated Gas Solution Survey
Additional bathymetric and topographical survey for SSAGS project production facilities.
Oghama Main-A Well Survey
Preliminary investigation (PI) survey of Oghama Main-A well in OML 111.
NPA Calabar River Channel Survey
Multi-beam bathymetric survey of NPA Calabar River Channel.
Tunu Flow Station Laser Scanning
Laser scanning of Benisede, Ogbotobo, Opukushi, and Tunu Flow Stations.
Ogboinbiri to Tebidaba Pipeline Survey
Topographical survey of 6" Ogboinbiri to Tebidaba oil pipeline project.
OML58 Upgrade Monuments GPS Survey
GPS survey of OML58 upgrade monuments.
Nimbe South Location Survey
Well location survey at Nimbe South for NAOC operations.
Clough Creek Bathymetric Survey
Bathymetric survey of Clough Creek for marine operations support.
Omoku Well Fix Survey
Well fix survey at Omoku location.
Bathymetric Investigation at Tunu